abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

هذه الصفحة غير متوفرة باللغة العربية وهي معروضة باللغة English

المقال

10 يناير 2023

الكاتب:
Paul Moore, International Mining

North Macedonia: Central Asia Metals' operations update shows 2 accidents involving employees at Sasa mine

إظهار جميع الإشارات الادعاءات

CAML’s Sasa in North Macedonia advancing cut and fill project plus new paste backfill plant, 10 January 2023

Central Asia Metals has provided a Q4 and full year 2022 operations update for the Kounrad dump leach, solvent extraction and SX-EW copper recovery plant in Kazakhstan and the Sasa zinc-lead mine in North Macedonia.

In 2022 summary there were zero lost time injuries (LTIs) at Kounrad and two LTIs at Sasa. There was record copper production at Kounrad, above guidance range at 14,254 t of copper produced. Zinc and lead production at Sasa was within guidance range with zinc in concentrate production of 21,473 t and lead in concentrate production of 27,354 t. For 2023 production guidance for Kounrad is 13,000 to 14,000 t. At Sasa, zinc in concentrate is expected to be 19,000 to 21,000 t and lead in concentrate, 27,000 to 29,000 t...