Georgia: Locals assure Shuakhevi hydropower plant is responsible for increasing water droughts and landslides in Nigazeuli
الملخص
Date Reported: 5 مايو 2021
الموقع: جورجيا
الشركات
Adjaristsqali Georgia LLC - Unknownالمشاريع
Shuakhevi HPP - Unknownالفئة المتأثرة
Total individuals affected: Number unknown
مجتمع: ( Number unknown - Location unknown - Sector unknown , Gender not reported )القضايا
Geological stability , الحقوق في الأراضي , الحصول على المياه , Impacts on Livelihoods , Personal Healthالرد
Response sought: لا
نوع المصدر: NGO
The cracks of Shuakhevi, 5 May 2021
Since the construction of Shuakhevi commenced in 2013, local communities have been complaining about their cracked houses, decreased crops, disappeared drinking water and water leakages. They complain that these are the direct consequences of the construction...
Shuakhevi is one of Georgia’s biggest and most controversial hydropower plants, which is mostly famous for its failure: in 2017, two months after becoming operational, its tunnels collapsed at eight spots...
In 2020, new problems came to light: one month after the newly repaired Shuakhevi power plant started operations, Georgian online media outlet Batumelebi published footage that showed water leaking out of Shuakhevi’s dam...
Adjaristsqali Georgia LLC (AGL) is the company behind Shuakhevi’s construction and operations. It is owned by Norway’s Clean Energy Invest AS, India’s Tata Power and IFC Infraventures. Norway’s Clean Energy is also associated with the construction of another controversial large dam in Georgia, Namakhvani, which has caused a wave of protest across the country...
The locals recall that the company representatives explained the disappearance of water to them as the consequences of ‘weather changes’.