abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

Esta página no está disponible en Español y está siendo mostrada en English

El contenido también está disponible en los siguientes idiomas: English, 简体中文, 繁體中文

Artículo

14 Ene 2022

Autor:
The Independent

Uganda: Court reduces amount granted to locals as compensation for land compulsorily acquired for power project by Sino Hydro

"Court quashes UGX9Bn award to Karuma power project land claimants"

The Court of Appeal has quashed the decision by the High Court to award 9.3 Billion Shillings as compensation to claimants of land where the government is currently constructing the Karuma Hydro Power Project. A panel of three justices Christopher Izama Madrama, Irene Mulyagonja, and Monica Mugenyi has set aside the award issued to nine people by the High Court Judge Andrew Bashaija...In 2015, the nine people sued the Attorney General and Sino Hydro Corporation Limited for compulsory acquisition of their two pieces of land measuring approximately 8.109 hectares and six hectares at Nora Kamdini in Oyam district.

The land was acquired between 2011 and 2012 for the construction of the Karuma falls dam by Sino Hydro Corporation Limited for the land measuring 8.109 hectares out of which a portion measuring 3.705 hectares was compulsorily acquired for the construction project. The remaining part of the land which falls outside the construction project was used as a dumping site and an access route by the construction firm...The Judge was also faulted for having gone ahead to award the 8.3 billion shillings as the price of the rock deposits which the government argued that the figure was reached upon based on speculation that the claimants were engaged in the business of rock exploitation and extraction of quarrying.

Línea del tiempo

Información de privacidad

Este sitio usa cookies y otras tecnologías de almacenamiento web. Puede configurar sus preferencias de privacidad más adelante. Los cambios se aplicarán de inmediato.

Para más información sobre el uso que hacemos del almacenamiento web, por favor consulte nuestra Política de Cookies y Uso de Datos

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

Cookies analíticas

ON
OFF

Cuando accede a nuestro sitio web, utilizamos Google Analytics para recopilar información sobre su visita. La aceptación de esta cookie nos permitirá conocer más detalles sobre su visita y mejorar la forma en que mostramos la información. Toda la información analítica es anónima y no la utilizamos para identificarle. Google proporciona un complemento de inhabilitación de Google Analytics para todos los navegadores populares.

Cookies promocionales

ON
OFF

Compartimos noticias y actualizaciones sobre empresas y derechos humanos a través de plataformas de terceros, incluidas las redes sociales y los motores de búsqueda. Estas cookies nos ayudan a comprender el rendimiento de estas promociones.

Sus preferencias de privacidad en este sitio

Este sitio usa cookies y otras tecnologías de almacenamiento web para mejorar su experiencia, mas allá de la funcionalidad básica necesaria.