abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

이 페이지는 한국어로 제공되지 않으며 English로 표시됩니다.

이 내용은 다음 언어로도 제공됩니다: English, 简体中文, 繁體中文

기사

2021년 11월 30일

저자:
Denis Žiško, Pippa Gallop, CEE Bankwatch Network

Bosnia and Herzegovina: Public loan guarantee for Tuzla 7 coal plant is illegal, govt. confirmed

Loan guarantee for Bosnia’s Tuzla 7 coal plant confirmed as illegal, 30 November 2021

A public loan guarantee for the planned Tuzla 7 coal power plant in Bosnia and Herzegovina is illegal under the Energy Community Treaty, the Ministerial Council of the Energy Community has confirmed...If realized, the project would aggravate Tuzla’s air pollution and prevent Bosnia and Herzegovina decarbonising its economy for decades to come.

A guarantee for a EUR 614 million loan from China Eximbank to build the 450 MW Tuzla 7 coal plant was cleared by the State Aid Council of Bosnia and Herzegovina in July 2018. 

Following a complaint submitted by the Aarhus Center Sarajevo and Bankwatch in September 2018, the Energy Community Secretariat twice advised the Federation of Bosnia and Herzegovina (FBIH) Parliament not to approve the guarantee, after its examination of the case indicated that it would be in breach of EU law.

However, the FBIH parliament’s House of Representatives and House of Peoples defied the warnings and approved the guarantee on 7 March and 1 April 2019...

Bosnia and Herzegovina’s independent transmission system operator has confirmed...that even if Tuzla 7 is not built, the electricity supply will not be endangered until at least 2030, and even then only if electricity consumption is at the higher end of what is expected...

타임라인

개인정보

이 웹사이트는 쿠키 및 기타 웹 저장 기술을 사용합니다. 아래에서 개인정보보호 옵션을 설정할 수 있습니다. 변경 사항은 즉시 적용됩니다.

웹 저장소 사용에 대한 자세한 내용은 다음을 참조하세요 데이터 사용 및 쿠키 정책

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

분석 쿠키

ON
OFF

귀하가 우리 웹사이트를 방문하면 Google Analytics를 사용하여 귀하의 방문 정보를 수집합니다. 이 쿠키를 수락하면 저희가 귀하의 방문에 대한 자세한 내용을 이해하고, 정보 표시 방법을 개선할 수 있습니다. 모든 분석 정보는 익명이 보장되며 귀하를 식별하는데 사용하지 않습니다. Google은 모든 브라우저에 대해 Google Analytics 선택 해제 추가 기능을 제공합니다.

프로모션 쿠키

ON
OFF

우리는 소셜미디어와 검색 엔진을 포함한 제3자 플랫폼을 통해 기업과 인권에 대한 뉴스와 업데이트를 제공합니다. 이 쿠키는 이러한 프로모션의 성과를 이해하는데 도움이 됩니다.

이 사이트에 대한 개인정보 공개 범위 선택

이 사이트는 필요한 핵심 기능 이상으로 귀하의 경험을 향상시키기 위해 쿠키 및 기타 웹 저장 기술을 사용합니다.