abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

이 페이지는 한국어로 제공되지 않으며 English로 표시됩니다.

보고

2021년 6월 7일

저자:
Andrey Hristov Ralev, Balkani Wildlife Society

Report: Biodiversity Offsetting and Other Problems of the ESIA of Amulsar Gold Project in Armenia

모든 태그 보기 혐의

...This document is a critical analysis, with regard to the impacts on biodiversity, of the Environmental and Social Impact Assessment (ESIA) of the Amulsar Gold Project. It adds new circumstances that require resumption of the ESIA procedure. The analysis was prepared by experts of Balkani Wildlife Society (Bulgaria) as requested by and with the support of CEE Bankwatch Network and EcoLur Informational NGO in support of the implementation of Chapter 3 (Environment) of the Comprehensive and Enhanced Partnership Agreement between the European Union and the Republic of Armenia (CEPA)...

The analysis of the Environmental and Social Impact Assessment (ESIA) of the Amulsar Gold Project prepared by Balkani Wildlife Society (Bulgaria) adds new circumstances that require the permits of the project to be annulated and the impact assessment procedure to be started from the beginning. With regards to biodiversity the permissions to develop the project were granted by the Government of Armenia in violation of the Bern Convention and the Armenian legislation...

[W]e include evidence on the pollution of the Arpa river during construction, when many fish died in 2018. The ESIA did not predict these damages. In letter H/A-2018/59 from 19.06.2018 of Lydian and letter 16.1/111/511-18 from 02.11.2018 of the Inspection Body this pollution is proven.

Thus, the decision of the EIA Expertise and all mining permits were given in violation of the Bern Convention, the RA Subsoil Code, the Law "On Flora", the Law "On Fauna", the Law on EIA and Expertise and should be canceled.

타임라인

개인정보

이 웹사이트는 쿠키 및 기타 웹 저장 기술을 사용합니다. 아래에서 개인정보보호 옵션을 설정할 수 있습니다. 변경 사항은 즉시 적용됩니다.

웹 저장소 사용에 대한 자세한 내용은 다음을 참조하세요 데이터 사용 및 쿠키 정책

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

분석 쿠키

ON
OFF

귀하가 우리 웹사이트를 방문하면 Google Analytics를 사용하여 귀하의 방문 정보를 수집합니다. 이 쿠키를 수락하면 저희가 귀하의 방문에 대한 자세한 내용을 이해하고, 정보 표시 방법을 개선할 수 있습니다. 모든 분석 정보는 익명이 보장되며 귀하를 식별하는데 사용하지 않습니다. Google은 모든 브라우저에 대해 Google Analytics 선택 해제 추가 기능을 제공합니다.

프로모션 쿠키

ON
OFF

우리는 소셜미디어와 검색 엔진을 포함한 제3자 플랫폼을 통해 기업과 인권에 대한 뉴스와 업데이트를 제공합니다. 이 쿠키는 이러한 프로모션의 성과를 이해하는데 도움이 됩니다.

이 사이트에 대한 개인정보 공개 범위 선택

이 사이트는 필요한 핵심 기능 이상으로 귀하의 경험을 향상시키기 위해 쿠키 및 기타 웹 저장 기술을 사용합니다.