Armenia: Construction of small hydropower plant on Amberd river continues without public consent
Краткое изложение
Date Reported: 19 Апр 2013
Местонахождение: Армения
Компании
Amberd HPP LLC - UnknownПроекты
Amberd-3 SHPP - UnknownЗатронуто
Total individuals affected: Number unknown
Сообщество: ( Number unknown - Location unknown - Sector unknown , Gender not reported )Темы
Протесты , Доступ к воде , Доступ к информации , Insufficient/inadequate consultation , Impacts on LivelihoodsОтвет
Response sought: Нет
Вид источника: NGO
No Public Hearings for SHP Construction in Byurakan, 19 April 2013
No public hearings were held on “Amberd” SHP construction project in Byurakan. This information was passed to EcoLur from Public Relations Department of Nature Protection Ministry. The alarm signal was beaten from Byurakan on Facebook by activist Apres Zohrabyan on 18 April... All the villagers oppose to this SHHP, as our land areas are endangered, which are irrigated from river water. The villagers headed for the construction site to oust the heavy machinery... Despite the statement on not having any public hearings, the construction works have already launched...