abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

这页面没有简体中文版本,现以English显示

法律诉讼

1 十月 2011

Osage Wind and Enel lawsuit (re wind farm project, USA)

状态: ONGOING

提诉日期
2011年10月1日
日期准确度
年份和月份正确
不适用
原住民, 人权捍卫者, Public entity
申诉地点: 美国
事发地点: 美国
诉讼类型: Domestic

企业

Enel 意大利 氢能, 能源
Osage Wind 美国 風能
Enel Green Power (part of Enel) 意大利 可再生能源

Sources

Snapshot: In October 2011, the Indigenous Osage Nation and the US initiated litigation against Osage Wind and Enel in Oklahoma, USA, alleging unauthorised mining regarding a wind farm project. Following an initial dismissal, a 2017 Tenth Circuit Court of Appeals decision reversed the ruling, affirming the occurrence of mining activities. In December 2023, the District Court granted summary judgment, ordered the removal of 84 wind turbines, and scheduled a trial to determine damages. The case is ongoing.

Factual background

Beginning in 2010, Osage Wind, Enel Kansas, and Enel Green Power leased approximately 8,400 acres in Osage County, Oklahoma, to construct a commercial wind farm. The project encompassed the installation of 84 wind turbines, along with associated infrastructure such as underground electrical lines, an overhead transmission line, meteorological towers, and access roads. Reinforced concrete foundations were utilised to secure the wind towers.

Legal argument

In 1906, the Osage Nation's reservation in Osage County underwent a division of surface and mineral estates through the Osage Act. This granted the Osage Nation the authority, subject to approval from the Secretary of the Interior, to issue leases for mineral extraction. According to regulatory oversight outlined in 25 C.F.R. Part 214, no mining activities are permitted on a tract of land until an approved lease is in place (Section 214.7).

The wind farm project, involving excavating and installing turbines and cables, resulted in the removal of sand, soil, and rock, causing irreversible alterations to the mineral estate. The companies were accused of failing to secure the necessary approval and engaging in unauthorised mining activities. Both the US and the Osage Nation argue that these activities constitute trespass, ongoing trespass, and conversion. In addition, some Osage Nation members opposed the project because of the fear of damaging the environment, its potential encroachment on sacred burial sites, as well as the turbines’ deadly impact on eagles, that are sacred birds.

The legal claims set forth by the US encompass five counts, mirrored by the Osage Mineral Council, except for an additional conversion claim. The violations are anchored in the infringement of 25 C.F.R. § 211 and 25 C.F.R. § 214, including trespass, continuing trespass, and conversion.

Legal proceeding

In October 2011, the Osage Nation Indigenous community filed a lawsuit before the District Court in Oklahoma against Wind Capital Group to halt the project, asserting that it unlawfully deprived them of mineral estate access.

On 20 December 2011, the case was dismissed on its merits.

On 21 November 2014, the US, acting as a trustee for the Osage Mineral Estate, initiated legal action against Osage Wind, Enel Kansas and Enel Green Power North America in front of the District Court. The lawsuit sought a declaratory judgment that the Defendants engaged in unauthorised mining and excavation without obtaining a lease.

The companies, in turn, moved for summary judgment on the claims because the facts of the case were undisputed and to avoid going to full trial.

On 30 September 2015, the District Court ruled in favour of the companies, stating that their activities did not amount to mining and, therefore, no lease was required.

The US did not appeal the District Court's decision, but the Osage Minerals Council, acting on behalf of the Osage Nation, did.

On 18 September 2017, the Tenth Circuit Court of Appeals reversed the decision, determining that mining activities had indeed taken place, requiring a lease under regulatory provisions. The case was referred back to the district court for further proceedings consistent with the decision.

The US and the Osage Mineral Council asked for summary judgment. The Plaintiffs argued for violations of 25 C.F.R. §211, 214, trespass, continuing trespass and conversion and sought injunctive relief.

On 20 December 2023, the District Court approved all claims and found summary judgment fitting, granting monetary damages for trespass and conversion to the plaintiffs. It stated that "permitting the wind turbines to remain in place will cause the Osage Nation to suffer irreparable harm and its sovereignty and authority to manage the mineral estate. This cannot be remedied by a payment of money damages." It ordered the wind turbines to be removed. Additionally, the District Court ordered a trial to be scheduled on the issue of damages.

In January 2024, Enel Energy announced that it plans to appeal the court decision.

In December 2024, Enel Energy was ordered to pay damages.

In March 2025 the removal of the wind turbines was temporarily paused during Enel's appeal process.

News Items

Court Documents

时间线

隐私资讯

本网站使用 cookie 和其他网络存储技术。您可以在下方设置您的隐私选项。您所作的更改将立即生效。

有关我们使用网络存储的更多信息,请参阅我们的 数据使用和 Cookie 政策

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

分析 cookie

ON
OFF

您浏览本网页时我们将以Google Analytics收集信息。接受此cookie将有助我们理解您的浏览资讯,并协助我们改善呈现资讯的方法。所有分析资讯都以匿名方式收集,我们并不能用相关资讯得到您的个人信息。谷歌在所有主要浏览器中都提供退出Google Analytics的添加应用程式。

市场营销cookies

ON
OFF

我们从第三方网站获得企业责任资讯,当中包括社交媒体和搜寻引擎。这些cookie协助我们理解相关浏览数据。

您在此网站上的隐私选项

本网站使用cookie和其他网络存储技术来增强您在必要核心功能之外的体验。