abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

这页面没有简体中文版本,现以English显示

文章

2021年8月1日

作者:
TMP Systems and International Rivers

Riverscope Case Study: Batang Toru, Indonesia Summary

Riverscope Case Study: Batang Toru, Indonesia Summary

August 2021

The electricity produced by large-scale hydropower is expensive in commercial, social, and environmental terms. Dams have significant and irreversible impacts on societies and ecosystems while being exposed to huge operational and financial risks. The way that these projects are assessed systematically underestimates these impacts and risks, meaning that investors, developers, and regulators often make the wrong decisions based on incomplete information.

This document summarizes an assessment of the proposed Batang Toru hydropower project in Indonesia, using the “Riverscope” assessment tool. Riverscope offers a new way to assess large dams by combining geospatial analysis, expert investigation, and financial modeling. Riverscope is unique in that it presents a commercial comparison between hydropower, solar ,and wind, alongside a rapid but wide-reaching environmental and social risk analysis. As such, it provides relevant information and analysis for governments, investors, and the third sector. The full assessment report and methodology is available at www.riverscope.org.

This Riverscope assessment of Batang Toru shows that:

  1. The project could be delayed by up to 9 years, mainly because of a combination of social and environmental challenges. This delay significantly reduces the dam’s financial value.
  2. Under the most likely scenario, Batang Toru will be 46% more expensive than solar by 2027 (the most probable starting date of operation), and 87% more by 2034.
  3. Alternative energy technologies could deal with energy poverty and security more cheaply and more rapidly than Batang Toru without incurring substantial negative impacts.

[...]

时间线

隐私资讯

本网站使用 cookie 和其他网络存储技术。您可以在下方设置您的隐私选项。您所作的更改将立即生效。

有关我们使用网络存储的更多信息,请参阅我们的 数据使用和 Cookie 政策

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

分析 cookie

ON
OFF

您浏览本网页时我们将以Google Analytics收集信息。接受此cookie将有助我们理解您的浏览资讯,并协助我们改善呈现资讯的方法。所有分析资讯都以匿名方式收集,我们并不能用相关资讯得到您的个人信息。谷歌在所有主要浏览器中都提供退出Google Analytics的添加应用程式。

市场营销cookies

ON
OFF

我们从第三方网站获得企业责任资讯,当中包括社交媒体和搜寻引擎。这些cookie协助我们理解相关浏览数据。

您在此网站上的隐私选项

本网站使用cookie和其他网络存储技术来增强您在必要核心功能之外的体验。