abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

这页面没有简体中文版本,现以English显示

文章

1 一月 2015

作者:
Sarawak Energy

Sarawak Energy fact sheet: “Murum Dam"

The Murum dam is the second hydroelectric project (HEP) to be developed by Sarawak Energy since Batang Ai HEP in the 1980s...The main EPC (Engineer, Procure, Construct) contractor is Three Gorges Dam Company (Malaysia) while Sarawak Energy acts as the project proponent in building the dam...The first round of community consultation on the dam took place in November 1994...Since then, the consultation involved visits to the directly affected longhouses in order to discuss the proposed project and consult with them with regard to all aspects of their proposed resettlement in order to reach amiable consent for the affected communities...From January 2010, the affected communities were consulted on the resettlement sites...The compensation policy for the affected community was guided by existing policies of the government...All 353 families living within the reservoir of Murum dam have been successfully resettled in early December 2013...Sarawak Energy is currently providing continuous assistance in ensuring that the communities can smoothly adapt to their new life. Schools have already started in the two resettlement areas with about 300 students...[Other initiatives]...are aimed at helping the realisation of the indigenous people’s aspirations for equal access to development.

属于以下案件的一部分

Malaysia: SUHAKAM report on Murum hydroelectric project and its impacts on indigenous peoples’ rights in Sarawak

Malaysian Bar Council report on impacts of Murum Dam on resettled indigenous communities

隐私资讯

本网站使用 cookie 和其他网络存储技术。您可以在下方设置您的隐私选项。您所作的更改将立即生效。

有关我们使用网络存储的更多信息,请参阅我们的 数据使用和 Cookie 政策

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

分析 cookie

ON
OFF

您浏览本网页时我们将以Google Analytics收集信息。接受此cookie将有助我们理解您的浏览资讯,并协助我们改善呈现资讯的方法。所有分析资讯都以匿名方式收集,我们并不能用相关资讯得到您的个人信息。谷歌在所有主要浏览器中都提供退出Google Analytics的添加应用程式。

市场营销cookies

ON
OFF

我们从第三方网站获得企业责任资讯,当中包括社交媒体和搜寻引擎。这些cookie协助我们理解相关浏览数据。

您在此网站上的隐私选项

本网站使用cookie和其他网络存储技术来增强您在必要核心功能之外的体验。