abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

這頁面沒有繁體中文版本,現以English顯示

內容有以下的語言版本: English, 한국어

文章

2024年8月13日

作者:
Kim Ju-Yeon, Korea JoonAng Daily

Fatal Aricell factory fire prompts stricter safety regulations to protect foreign workers

The Ministry of Labor and Employment announced tighter safety regulations and support measures for manufacturing facilities in an effort to protect foreign employees in response to the deadly fire that killed 23 Aricell factory workers...

The plan, announced Tuesday, includes up to 100 million won ($73,000) in financial support for workplaces to install fire detection and alarm systems or change passageway designs for better evacuation; conduct mandatory safety training for all foreign workers; and implement stricter risk assessment screening for firm.

The finances for the support measures will be partially covered by raising the rate for safety management expenses companies pay to contractors by an average of 19 percent, the Labor Ministry said. Safety management expenses are covered by companies for construction work, and the contractor is required by law to use the payment toward employee safety and health. The rate had been the same for the last 10 years.

Contractors were required to pay for 60 percent of the safety technology and equipment used to prevent accidents, while 40 percent had been covered by the safety management expenses. The burden on contractors will be cut down to 30 percent in 2025, and down to zero in 2026...

The ministry also proposed a consultation program for industrial sites that have evaluated themselves to fall short of safety standards, which will provide consultations and mandate interviews with company heads within three months, with checkups six months after the consulting ends...

Inspections will be conducted at 200 manufacturing facilities that are at high risk of fires or explosions and have not been reviewed in the last three years.

This is in response to criticism over the exemption of Aricell’s Hwaseong factory from inspection despite it being a high-risk production site, and three consecutive years of Risk Assessment Certification.

...

時間線

隱私資訊

本網站使用 cookie 和其他網絡存儲技術。您可以在下方設置您的隱私選項。您所作的更改將立即生效。

有關我們使用網絡儲存技術的更多資訊,請參閱我們的 數據使用和 Cookie 政策

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

分析cookie

ON
OFF

您瀏覽本網頁時我們將以Google Analytics收集信息。接受此cookie將有助我們理解您的瀏覽資訊,並協助我們改善呈現資訊的方法。所有分析資訊都以匿名方式收集,我們並不能用相關資訊得到您的個人信息。谷歌在所有主要瀏覽器中都提供退出Google Analytics的添加應用程式。

市場營銷cookies

ON
OFF

我們從第三方網站獲得企業責任資訊,當中包括社交媒體和搜尋引擎。這些cookie協助我們理解相關瀏覽數據。

您在此網站上的隱私選項

本網站使用 cookie 和其他網絡儲存技術來增強您在必要核心功能之外的體驗。