abusesaffiliationarrow-downarrow-leftarrow-rightarrow-upattack-typeburgerchevron-downchevron-leftchevron-rightchevron-upClock iconclosedeletedevelopment-povertydiscriminationdollardownloademailenvironmentexternal-linkfacebookfiltergenderglobegroupshealthC4067174-3DD9-4B9E-AD64-284FDAAE6338@1xinformation-outlineinformationinstagraminvestment-trade-globalisationissueslabourlanguagesShapeCombined Shapeline, chart, up, arrow, graphLinkedInlocationmap-pinminusnewsorganisationotheroverviewpluspreviewArtboard 185profilerefreshIconnewssearchsecurityPathStock downStock steadyStock uptagticktooltiptwitteruniversalityweb

Esta página não está disponível em Português e está sendo exibida em English

O conteúdo também está disponível nos seguintes idiomas: English, 한국어

História

31 Mai 2023

Road to rights: Companies respond to allegations linked to infrastructure projects in EECA

See all tags

In May 2023, the Business & Human Rights Resource Centre published Road to rights: The human cost of the new “Middle Corridor” - an analysis of the scale and scope of human rights abuse linked to infrastructure investments in Eastern Europe and Central Asia, outlining the approaches which must be urgently adopted to deliver infrastructure which builds shared prosperity and a stable investment environment, as well as avoid the growing corporate regulatory, legal and reputational risks of abusing human and environmental rights.

The briefing focuses on completed, ongoing and planned infrastructure projects with actual and potential risks. The briefing also outlines recommendations for investors and companies to ensure further development is not accompanied by human rights and environmental abuse.

In line with the Resource Centre’s strategy and libel policy, we made every effort to reach out to companies and investors accused of abuse and ask them to respond to allegations made using our Company Response Mechanism (unless the company has already publicly commented on the case, or if the abuse is the basis of a lawsuit or regulatory action, or the company has no website or contacts to reach to them).

We received nine responses - four responses from companies and five responses from investors.

All company/investor responses and non-responses can be found below.

Respostas da empresa

China Railway Construction

Sem resposta

China Development Bank

Sem resposta

JP Autoceste FBiH Ver resposta
Asian Development Bank (ADB) Ver resposta
Longhai Road and Bridge Corporation

Sem resposta

China Road and Bridge Corporation

Sem resposta

China Exim

Sem resposta

Saudi Fund for Development

Sem resposta

Hunan Road & Bridge Construction Group Company Limited

Sem resposta

Asian Infrastructure Investment Bank, AIIB

Sem resposta

China Xinxing Construction & Development Co

Sem resposta

State Company KazAvtoZhol JSC

Sem resposta

Akzhol Kurylys LLP

Sem resposta

AzVirt LLC

Sem resposta

Assana DorStroy LLP

Sem resposta

City Transportation Systems LLP

Sem resposta

China Railway International Group

Sem resposta

Beijing State-Owned Assets Management Co., Ltd.

Sem resposta

Bakad Investment and Operations LLP Ver resposta
Alsim Alarko Sanayi Tesisleri ve Ticaret A.S.

Sem resposta

Makyol Insaat Sanayi Turizm ve Ticaret A.S.

Sem resposta

SK Engineering and Construction

Sem resposta

Korea Expressway Corporation Ver resposta
Bank of China

Sem resposta

Dutch pension fund PGGM

Sem resposta

China Railway 23rd Bureau Group (part of CRCC)

Sem resposta

Georgian Railway JSC

Sem resposta

European Investment Bank (EIB)

Sem resposta

China National Water Resources & Hydropower Engineering (Sinohydro)

Sem resposta

China Railway Tunnel Group Co., Ltd. (subsidiary of CREC)

Sem resposta

Shandong Hi-Speed ​​International (SDHS)

Sem resposta

Western Balkans Investment Framework

Sem resposta

Vodno Stroitelstvo-Blagoevgrad

Sem resposta

ENKA Insaat ve Sanayi A.S. Ver resposta
Bechtel

Sem resposta

Granit Construction Stock Co.

Sem resposta

Victoria Invest LLC

Sem resposta

Bemax

Sem resposta

Cijevna Komerc

Sem resposta

Opus Global

Sem resposta

Avtodor

Sem resposta

Avtoban JSC

Sem resposta

Mostotrest PJSC

Sem resposta

European Bank for Reconstruction and Development (EBRD) Ver resposta
Islamic Development Bank Ver resposta
Eurasian Development Bank Ver resposta

Linha do tempo

Privacy information

Este site usa cookies e outras tecnologias de armazenamento na web. Você pode definir suas opções de privacidade abaixo. As alterações entrarão em vigor imediatamente.

Para obter mais informações sobre nosso uso de armazenamento na web, consulte nossa Política de Uso de Dados e de Cookies

Strictly necessary storage

ON
OFF

Necessary storage enables core site functionality. This site cannot function without it, so it can only be disabled by changing settings in your browser.

Cookies analíticos

ON
OFF

Quando você acessa nosso site, usamos o Google Analytics para coletar informações sobre sua visita. A aceitação deste cookie nos permitirá entender mais detalhes sobre sua viagem, e melhorar a forma como nós colocamos as informações na superfície. Todas as informações analíticas são anônimas e não as utilizamos para identificá-lo. O Google fornece uma opção de não inclusão no Google Analytics para todos os navegadores populares.

Cookies promocionais

ON
OFF

Compartilhamos notícias e atualizações sobre empresas e direitos humanos através de plataformas de terceiros, incluindo mídias sociais e mecanismos de busca. Estes cookies nos ajudam a entender o desempenho destas promoções.

Suas escolhas de privacidade para este site

Este site usa cookies e outras tecnologias de armazenamento da web para aprimorar sua experiência além da funcionalidade básica necessária.